Hello guest
Your basket is empty
The new stores building was designed, built and opened. This new building has enabled us to increase our stores capacity by 150%. The was carried out over six months, starting in early December 2014. The shell was up before Christmas and final fixing were completed 3 months later. 
Going from: 
To: 
On the roof can be seen the extra 20Kw of solar panels we have installed - giving us 30Kw total of solar power. 
Share this post:

Leave a comment: